Vivitec.AI

Project Management

Own the intelligence behind every pursuit, contract, and program.

Vivitec helps government contractors connect Costpoint, Unanet, GovWin, SAM.gov, SharePoint, spreadsheets, and proposal history into one operating intelligence layer.

The GovCon data problem

Institutional knowledge lives in systems that do not talk to each other.

The source deck frames the pain clearly: the data is already yours, but it is scattered across rented systems, locked portals, SharePoint folders, and spreadsheets.

Costpoint and Unanet

Contract financials, labor categories, burn rates, wrap rates, and utilization signals stay locked inside operational systems.

GovWin and SAM.gov

Opportunity intelligence is separated from the contract, staffing, and past-performance context needed to pursue it well.

SharePoint and Excel

Proposal artifacts, trackers, calendars, and staffing views become fragile side systems instead of durable intelligence.

Proof model

The demo was modeled around real GovCon operating texture.

The attached demo uses a fictional geospace contractor, but the scale and details are intentionally familiar to government contracting SMB leaders.

406

Employees

A fictional firm large enough for utilization, bench, and clearance risk to matter.

10

Contracts

A portfolio view with funding, staffing, burn-rate, risk, and recompete signals.

$285M

Backlog

Program visibility at the level leadership needs for planning and intervention.

The solution

One data layer. Unlimited intelligence.

Vivitec connects the systems once, normalizes the operational data, and builds intelligence on top of the data layer your organization owns.

The deck architecture is explicit: source systems flow into your data layer in your Azure tenant, then Vivitec builds dashboards, RAG matching, proposal support, and operational intelligence on top.

The result is not another SaaS trap. If a firm swaps Costpoint for Unanet next year, the data layer survives and the intelligence layer keeps improving.

Portfolio Command Center

Give leaders a practice-wide view of the work already in motion.

The demo frames six portfolio views that translate scattered project data into management decisions.

Contract Portfolio

Burn rates, funding, staffing, and delivery risk for active programs.

Recompete Calendar

What expires, when to worry, and what happens to the bench if work is lost.

Labor and Utilization

Deployed staff, bench exposure, clearance inventory, and capacity signals.

Compliance Posture

DCAA readiness, CMMC status, indirect rate health, and audit evidence.

Pipeline

Opportunities by stage, positioning, and win probability.

Win/Loss

What the firm actually wins compared with what the team thinks it should win.

Opportunity 360

Move from pursuit signal to proposal response in one flow.

Opportunity 360 turns the demo into a sequence: qualify the pursuit, match the evidence, assemble the response, then check compliance before the team ships.

Step 01

Qualify the pursuit

Estimated value, stage, win probability, and Go/No-Go status sit in one decision view.

Step 01

Qualify the pursuit

Estimated value, stage, win probability, and Go/No-Go status sit in one decision view.

Qualify the pursuit

Step 02

Match the evidence

RAG matching finds relevant past performance, contract proof, and response language.

Step 02

Match the evidence

RAG matching finds relevant past performance, contract proof, and response language.

Match the evidence

Step 03

Assemble the response

Reusable response blocks, past-performance references, and management approach drafts move into the proposal workflow.

Step 03

Assemble the response

Reusable response blocks, past-performance references, and management approach drafts move into the proposal workflow.

Assemble the response

Step 04

Verify the package

Section L requirements, volume structure, page limits, attachments, and compliance language are checked before submission.

Step 04

Verify the package

Section L requirements, volume structure, page limits, attachments, and compliance language are checked before submission.

Verify the package

Secure GovCon delivery

Start with the boundary, then connect the intelligence.

Vivitec does not treat security as a late-stage review. The project-management layer is planned around penetration testing, NIST 800-171 alignment, CMMC readiness, and client-controlled Azure environments before operational data starts moving.

The intelligence layer should help teams move faster without turning contract, compliance, and proposal data into another external dependency.Vivitec project management solution

Build the intelligence layer

Make project management intelligence an owned asset.

Start with the operational systems and proposal history you already have. Vivitec turns that scattered data into a secure foundation for portfolio oversight, pursuit decisions, and proposal execution.